Engineering and construction for infrastructure. Calgary, Alberta.

Built to carry.

Bridges, transit, water and energy works across Western Canada. We engineer, procure and build them under one contract, and we answer for every member.

Test load of 900 kilonewtons. Press Enter to place it on the deck, then use the arrow keys to move it along the span.

Scroll to erect the span

Load at
0 m
Max member force
0 kN
Midspan deflection
0.0 mm

Deflection drawn ×200. Illustrative model, not a design calculation.

How we work

We are a contractor that thinks like the owner. The drawing, the price and the programme come from one team, so when something changes there is one place it gets solved.

Self-performed
Steel erection, structural concrete, earthworks and temporary works.
Checked twice
Every temporary works design is checked by an engineer outside the project team.
Where
Alberta, British Columbia, Saskatchewan and the territories.

Five sectors.
One standard of work.

The structures change. The way we plan, check and hand them over does not.

  1. Transport

    Bridges, interchanges, light rail guideways and rail grade separations.

  2. Water

    Treatment plants, reservoirs, pump stations, river intakes and outfalls.

  3. Energy

    Substations, transmission foundations, pipeline crossings and heavy-haul routes.

  4. Resources

    Haul roads, tailings structures, process buildings and camp infrastructure.

  5. Social infrastructure

    Hospitals, schools, courthouses and the civil works around them.

Pick the contract.
We will tell you the risk.

Four ways to work with us, and where the risk sits in each. If a model is wrong for your project, we say so before you issue the tender.

Model We join Price certainty Design risk sits with Suits
EPC, lump sum After your requirements are written Fixed at contract Us Defined scope, one point of accountability
Design-build At reference design Fixed at award Us, from the reference design on Public works where the date matters most
Construction management at risk Early design Guaranteed maximum price once design is far enough along Your designer Tight sites, phased occupancy, live facilities
Alliance or IPD Day one Target cost, overruns and savings shared Shared by the alliance High uncertainty, work on assets that must stay in service

Five gates.
None skipped.

A project moves forward only when the owner's representative, our project director and an independent checker sign the same gate. That board meets at every one.

  1. G0

    Need confirmed

    Scope, constraints and the owner's measure of success, written down and agreed.

  2. G1

    Option chosen

    Options costed on the same basis. The reasons for the choice go on record.

  3. G2

    Design frozen

    Independent check complete. Changes after this point carry a price and a date.

  4. G3

    Ready to build

    Permits, temporary works, crews and long-lead steel in hand before anyone mobilises.

  5. G4

    Handed over

    Commissioned, as-built drawings issued, operators trained on the asset itself.

Stop-work authority

Anyone on site can stop a task they believe is unsafe, without having to argue the case first.

One report

The owner gets the same monthly report every month: cost, programme, risks and safety, in that order.

Open book

On target-cost and GMP work, our ledger is your ledger. Every invoice, every hour.

Sample work

Placeholders for real projects. Everything below is fictional and shows how a case would be presented.

Sample project, fictional

140 m truss replacement over a river crossing

The old span came out in two lifts and the new Pratt truss was launched from the east bank. The road closed at night only.

Model
EPC, lump sum
Sector
Transport

Sample project, fictional

A fourth filtration train beside a live plant

Built next to three trains in service. Tie-ins were made in planned shutdowns agreed a season ahead.

Model
Design-build
Sector
Water

Sample project, fictional

Substation foundations and civil works

Piled gantry foundations, transformer bunds and the access road, sequenced around the electrical contractor.

Model
Construction management at risk
Sector
Energy

What do you need, and at what stage?

Pick a sector and the phase your project is in. You get what we would bring, the contract models that fit and what lands on your desk.

Sector
Project phase

    What we bring

      Contract models that fit

        On your desk

          Invite us to bid.

          Tell us about the procurement. An estimator replies with a go or no-go and, if it is a go, who will lead the bid.

          Concept site: nothing you type here is sent or stored.

          Concept build by Justin Creative Studios →