Rooftop solar for business and the public sector, Jakarta

Every roof faces
the sun.

We survey, design, finance, build and run solar for factories, campuses and public buildings. You keep the roof. The sun pays part of the bill.

Sample array outputsun 11:40

1,034kW

of a 1.42 MWp sample rooftracking 96%

Why roofs

A factory roof in Jakarta takes strong sun on most days of the year, and almost all of it bounces straight back into the sky. We put that light to work as power you use on site, at a price you can plan around for the life of the contract.

Top-down view of an industrial roof covered in rows of solar modules
The same grid, seen from a drone. Photo for illustration.
  • Industrial and logisticsWarehouses, plants, cold stores
  • Campuses and officesUniversities, HQs, business parks
  • Public buildingsHospitals, schools, transport hubs

Five stages.
One contract.

  1. Survey

    Drone survey, a structural check of the roof and twelve months of your meter data.

    You receive: a site report
  2. Design

    Module layout, a yield model and a grid connection plan, signed by an engineer of record.

    You receive: a design pack and yield forecast
  3. Finance

    Buy it, lease it, or pay only for the power it makes. One price sheet, no hidden escalators.

    You receive: a term sheet
  4. Build

    Installed around your shifts, with one site lead and a written report every week.

    You receive: a commissioned system
  5. Operate

    Monitoring, cleaning and repairs for the life of the contract, measured against the forecast we signed.

    You receive: a monthly performance report

Pay for the panels,
or only for the power.

Upfront costThe system priceNoneNone
You payOnce, plus optional upkeepA fixed monthly feeOnly the kWh it makes, below your grid tariff
Who owns itYou, from day oneUs, then you at term endUs, for the contract term
UpkeepOptional contractIncludedIncluded
Best whenYou have capital and want the lowest lifetime costYou want to own it without a large outlayYou want savings from the first month and no asset on the books

Estimate a roof.

Every tariff and assumption below is sample content, labelled as such. A site survey replaces them with your own numbers.

Site
Tariff (sample values)
How you pay
Year-one saving
Rp 0
System size
0 kWp
Generation, year one
0 MWh
Share of your power
0%
Upfront
Rp 0
Payback
n/a
CO₂ avoided, year one
0 t
Sample assumptions used
  • Usable density 0.15 kWp per m² of roof.
  • Yield 1,260 kWh per kWp per year (Jakarta sample, after losses).
  • Daytime share of your use: factory 55%, office 70%, retail 65%, public 60%. The system is sized so it never exports.
  • Buy price Rp 10.5 million per kWp. Lease 0.95% of that price per month. Pay per kWh at 80% of the sample tariff.
  • Grid emission factor 0.78 kg CO₂ per kWh.
  • All tariffs are sample values for illustration, not current rates.

Book a site survey

Roofs at work.

Sample projects for this concept. Names, sizes and photos are illustrative.

Aerial view of an industrial estate with solar on every roof

Sample project

Logistics estate, Cikarang

MWp
2.40
Model
Pay per kWh
Roofs
6
Three technicians in orange coveralls cleaning rooftop solar modules

Sample project

Food plant, Karawang

MWp
1.12
Model
Lease
Roofs
2
Aerial view of long rows of solar modules over dry yellow grass

Sample project

Ground-mount pilot, East Java

MWp
3.00
Model
Buy
Rows
48
Jakarta skyline in afternoon haze above a curved factory roof

Sample project

Teaching hospital, South Jakarta

MWp
0.64
Model
Pay per kWh
Roofs
3

Someone signs for every kilowatt-hour.

Solar is a twenty-year promise. These are the people and checks that keep it, in writing.

  1. Engineer of record

    Every design carries the name of the engineer who signed it, and that name stays on the asset file.

  2. A second opinion on yield

    Before you sign, an independent reviewer checks our generation forecast. You see their report, not a summary of it.

  3. One page for finance

    Each month: generation, savings and faults against the forecast, in a format your finance team already uses.

  4. Data you can audit

    Metered, timestamped readings exported for your sustainability report, with the method written down.

Your reporting line (sample)

  1. Site leadOn your roof every build day
  2. Head of deliveryOwns time, cost and safety
  3. Asset managerOwns output for the contract term
  4. Board risk committeeReviews every project over 1 MWp

Send us a roof.

A site plan, an address or a map pin is enough to start. We reply with a first look within two working days.

Estimate a roof
Concept build by Justin Creative Studios